Cost of installed equipment, material and labour directly involved in the physical construction of the permanent facility. - DIRECT LABOR (DL) - The cost of man- power necessary to construct a facility. Includes craft labour and field supervision through the general foreman level. DIRECT MATERIAL (DM) - The cost of all goods and sub-contract cost necessary for construction of a facility.