work breakdown structure (wbs)

de: Projektstrukturplan (PSP)

Methodology for the definition of a hierarchal structure of responsibilities and work in a project. The structure is followed by the identification of the highest working levels of the project, which will be broken down in smaller modules. The structure breakdown continuous until a very detail level is reached. Once the WBS is implemented it is wiser to generate reports on different levels.